[1]MARTIN-PEREZ B,ZIBARA H,HOOTON R D,et al.A study of the effect of chloride binding on service life predictions[J].Cem Concr Res,2000,30(8):1215-1223. [2]WENG Zhicai.Study on chloride binding capability of concrete and nonlinear problems(in Chinese,dissertation).Shenyang:Shenyang Ji- anzhu University,2006. [3]Ministry of Communications of the Peoples Republic of China. JTJ270-98 testing code of concrete for port and waterway engineering [S].China:Ministry of Communications of the Peoples Republic of China,1998. [4]NILSSON L O,MASSAT M,TANG L.The effect of non-linear chlo- ride binding on the prediction of chloride penetration into concrete structures[A]//MALHOTRA V Med.Durability of Concrete[C].De- troit:American Concrete Institute,1994.469-486. [5]XIE Youjun,CHEN Shuping,LONG Guangcheng.Experimental study on improvement of chloride ion binding of cement paste[J].J Railway Sci Eng(in Chinese),2007,4(2):1-5. [6]CHEN Yimin,ZHANG Hongtao,LIN Zhen.Hydration rate of fly ash and probability of poor lime phenomena in concrete of the Three Gorges Project[J].J Hydr Eng(in Chinese),2002(8):7-11. [7]MOHAMMED T U,HAMADA H.Relationship between flee chloride and total chloride contents in concrete[J].Cem Concr Res,2003,33(9): 1487-1490. [8]LIU Bingjing.Durability design of concrete structures(in Chinese). Beijing:China Communications Press,2007:127.
|